Confirm interface with Street Manager / Field Mappings |
Street Manager introduces Refusal reasons. We will map these onto Notice Types that have a DfT Reference "Refuse PAA/Permit/Variation" that contain the Reason for refusal code in the Notice Type name.
Modification Requests from Street Manager do not currently allow revised Permit Conditions to be proposed. When sending Modification Requests from Confirm we will combine all of the proposed Condition changes into a single text field.
EToN allows a Grant to be issued even after a Permit Application is Deemed, but Street Manager does not allow Grant to be issued for a Deemed application.
In EToN a Grant, Refuse or Modification Request (Permit decision) applies to all of the Applications, Modifications or Variations received up until that point, whereas in Street Manager a decision is recorded against the specific Permit or Change. When exporting a Permit decision to Street Manager, Confirm will only apply the decision to Permits or Changes that had already been downloaded into Confirm at the time the Permit decision was logged in Confirm (to avoid Granting something that the Confirm user hasn't seen yet).
Another complex scenario relates to how Street Manager deals with proposed changes to permits that haven't been granted yet... If a Promoter submits a Permit application to Street Manager but then requests a change before the original Permit has been Granted then the change details will be incorporated into the main Permit application and effectively granted when the permit is granted. The following scenario is therefore possible:
In this scenario the permit should not be granted because the user did not see the change entered at step 3. The proposed behaviour is that the Grant will not be logged in Street Manager and will be overwritten by the Permit change from street manager (so in Confirm it will look like the Grant never happened). The user can then Grant the permit with the change in Confirm and re-send this to Street Manager.
Refusal reason codes can be specified from Confirm in two ways:
The following Notice Types will be added to map to Street Manager Reasons for refusal. All with have their Dft Ref. set to "Refuse PAA/Permit/Variation".
The existing standard "Refuse Permit / PAA / Variation" Notice type will be used to represent "RC50 - Other (General)" unless the Notification Comment includes one or more valid "RC" codes.
Notice Type Code | Notice Type Name |
---|---|
RC10 | Refuse: Missing Information (General) |
RC11 | Refuse: Condition Not Provided/Not |
RC12 | Refuse: TM Not Received |
RC20 | Refuse: Incorrect Details on Permit (General) |
RC21 | Refuse: Incorrect Primary Recipient |
RC22 | Refuse: Location issues |
RC23 | Refuse: Conflicting Information |
RC30 | Refuse: Co-ordination Issues (General) |
RC31 | Refuse: Clash of Works |
RC32 | Refuse: Timing of Works |
RC33 | Refuse: Collaboration/Coordination |
RC40 | Refuse: Lack of Approval (General) |
RC41 | Refuse: Incorrect TM |
RC42 | Refuse: Early Start Agreement |
RC43 | Refuse: S.58 Restriction |
RC44 | Refuse: Duration |
Street Manager may also automatically cancel a proposed change if this is not granted before the works stop. In this scenario Confirm will generate an Refusal Notice for the cancellation using a new Notice Type Code of "RCCR" - "Street Manager Cancelled Change Request".
Under EToN the Duration Challenge notice is separate from the Grant notice, whereas Street Manager combines these into a single "Grant with duration challenge" permit change decision. During import of a Grant with duration challenge into Confirm, the Street Manager Agent will create two notices in Confirm, a Grant followed by a Duration Challenge.
A new "Grant with Duration Challenge" Notice Type has been added which can be selected from the Grant wizard. If this is selected then the Confirm Street Manager agent will indefinitely prevent the Grant from being set to Street Manager until a Duration Challenge has been entered into Confirm. Note that this must be used with caution as the Permit could deem if a "Grant with Duration Challenge" notice is entered without subsequently adding the Duration Challenge. This change introduces the following two new notice types:
Notice Type Code | Notice Type Name |
---|---|
161D | Grant Permit with Duration Challenge |
162D | Grant Variation with Duration Challenge |
On export, when the Street Manager agent encounters a normal Grant notice in Confirm it will "look ahead" to see if this has been followed by a Duration Challenge, and if so will record a Grant with duration challenge in Street Manager.
If a Duration Challenge is encountered after the Grant has already been sent to Street Manager then this will not be sent and a Transfer warning will be recorded.
Street Manager Field | Confirm Field | Notes (When importing into Confirm from Street Manager) | Notes (When exporting from Confirm to Street Manager) |
---|---|---|---|
Assessment decision | Street Works > Permit Status | ||
Permit fee discount | Street Works > Conditions > Discount | ||
Reason for refusal |
Street Works > Notice Type > Code Street Works > Transfer > Notice comments |
If a Notice Type cannot be found with a Code matching the refusal reason then the refusal reason text will be prepended to the Notice Comments. If more than one Reason code is supplied then the second and subsequent Reasons will be prepended to the Notice Comments. |
The refusal codes will be populated from valid "RC" codes found in the Notice Comments and/or the Notice Type specified. If the Confirm Notice Type Code is not a valid refusal code and no "RC" codes are found in the Notice Comments, then "RC50 Other (General)" will be supplied. |
Refusal details Modification request details Grant with duration challenge > Details |
Street Works > Transfer > Notice comments |
For Modification Requests, if the selected Conditions or Condition Text has been changed then the details of the change will be appended to the Modification request details. For refusals, if there are no notice comments, refusal details will be defaulted to 'None supplied.' |
|
Reasonable period end date | Street Works > Reasonable Period | Will generate two notices in Confirm, a Grant Variation followed by a Duration Challenge | See note above on Duration Challenges |